Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
The following systems are to be supplied, installed, set to work, tested, commissioned, handed over and maintained for the 12 months Defects Liability Period:
| Lot | Title | Value |
|---|---|---|
| 1 | The following systems are to be supplied, installed, set to work, tested, commissioned, handed over and maintained for the 12 months Defects Liability Period: - Downtakings and Removals - Internal Gas Service - Replacement of Existing Heating Plant and Associated pipework, flue, valves and pumps - Air Handling unit remedials - Cold Water storage tank and Booster Set replacement - Hot Water Service Plant replacement - Automatic Controls Installation - Thermal Insulation - AssociThe following systems are to be supplied, installed, set to work, tested, commissioned, handed over and maintained for the 12 months Defects Liability Period: - Downtakings and Removals - Internal Gas Service - Replacement of Existing Heating Plant and Associated pipework, flue, valves and pumps - Air Handling unit remedials - Cold Water storage tank and Booster Set replacement - Hot Water Service Plant replacement - Automatic Controls Installation - Thermal Insulation - Associated General Works - Builderswork in connection with services - Lighting to Main hall - Small Power, Fire alarms and Minor Electrical Works - Testing & Commissioning - Defects Liability Maintenance - Asbestos surveys and removals | — |
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award CRN00044517-1 | Hutcheon Services Ltd | £514,971 | 29 May 2026 |