Design and Installation of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill Site

Expired

Cyson Cymru

Highlights

Deadline
14 Aug 2026
Estimated value
£2,700,000
Location
UKL21

Details

Published
17 Jul 2026
Deadline
14 Aug 2026
Value
£2,700,000
Location
UKL21
Source
Find a Tender
Source notice ID
067821-2026
OCID
ocds-h6vhtk-06620e
CPV codes
09331000, 09332000, 31000000, 45000000
View on Find a Tender

Description

Cyson Cymru, on behalf of Newport City Council (NCC), is seeking Engineering, Procurement and Construction (EPC) proposals for the turnkey design, installation, and commissioning of the solar farm and a DC coupled battery with a 400V grid connection at the Newport City Council’s recycling centre depot in Newport, to form a fully compliant and working installation.

It is anticipated that the EPC contract will be awarded in 2026, and the design and construction will be undertaken in 2026/7.

The Contractor will be responsible for the supply, installation, and maintenance of a solar photovoltaic and battery system (the ‘Works’) up to 1.1MWp in gross PV capacity with a 2MWh DC battery energy storage system (BESS) on the land shown in Appendix 19.3 of the Specification, and located at grid reference ST306857.

Similar opportunities

More from Cyson Cymru

View all

Lots (1)

LotTitleValue
1Lot 1£2,700,000
Design and Installation of a Solar Farm and Battery Energy Storage… | Winston Scout