Design and Installation of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill Site
TerminationHighlights
- Deadline
- —
- Estimated value
- —
- Location
- —
Details
- Published
- 20 Jul 2026
- Deadline
- —
- Value
- —
- Location
- —
- Source
- Find a Tender
- Source notice ID
- 068103-2026
- OCID
- ocds-h6vhtk-06620e
- CPV codes
- —
More from Cyson Cymru
View all- Design and Construction of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill SiteExpiredCyson CymruClosed 17 Aug 2026
- Design and Installation of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill SiteExpiredCyson CymruClosed 14 Aug 2026
- Supply & Installation of an External Play Area at Milton Flying StartAwardCyson CymruAwarded
- Refurbishment of an Existing Play Area at Gaer Flying StartAwardCyson CymruAwarded
- Kitchen Refurbishment at Malpas Court Primary SchoolAwardCyson CymruAwarded
Lots (1)
| Lot | Title | Value |
|---|---|---|
| 1 | Lot 1 | — |
Awarded contracts (1)
| Title | Supplier | Value | Awarded |
|---|---|---|---|
| Award 1 | — | — | — |