DNWP0027- Lot 1B / WAGR B55 Demolition - Sellafield - A2R JV

Tender

Altrad AtkinsRealis Joint Venture (A2R JV)

Highlights

Tender deadline
10 Nov 2026
Estimated value
£5,000,000
Location
—

Details

Published
26 Oct 2026
Tender deadline
10 Nov 2026
Value
£5,000,000
Location
—
Source
Contracts Finder
Source notice ID
3244a195-4d3f-4923-b52f-8858e90ad9d1-919214
OCID
ocds-b5fd17-78ed4213-9d0a-4592-888a-9fb536485976
CPV codes
45251111
View on Contracts Finder

Description

The B55 and B55.2 demolition project at Sellafield involves the controlled demolition and dismantling of the B55 Office Complex and B55.2 Turbine Hall, located within the WAGR complex, down to existing ground-floor slab level. The scope includes soft stripping, asbestos remediation, high-reach mechanical demolition of the structural frame, cladding and reinforced-concrete floors, together with segregation and processing of demolition arisings, backfilling of voids and final site clearance.

A key constraint is Substation 65, which is located within the B55/B55.2 structure and must remain operational and be protected from demolition impacts, dust and water ingress throughout the works. Retained basements and associated structures also require protection, while uncertainties associated with ageing structures, buried services, below-ground voids and incomplete historical information must be managed through robust surveys, demolition engineering and risk-informed planning.

Overall, the project is intended to provide a safe, demolition-led solution that reduces workforce exposure, removes redundant infrastructure and supports accelerated hazard reduction across the wider WAGR decommissioning programme.

Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation

https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract