Sign in to tag this notice and share notes on it with your team.
Winston AI writes a plain-English brief of every opportunity — what the buyer wants, and what affects whether to bid. It's free in every Scout workspace. Sign in to see it.
J. Murphy & Sons invites expressions of interest from experienced civil engineering subcontractors for inclusion on a framework of regional lots across England, supporting major infrastructure programmes.
The framework will provide call off opportunities aligned to regional delivery teams and project locations.
Project Portfolio Includes:
Network Rail CP7
TransPennine Route Upgrade (TRU)
Peel Ports
Other rail and infrastructure projects across England
Scope of Services:
The framework will cover the provision of rope access and de vegetation services, including:
Rope Access Operations (IRATA)
Provision of IRATA certified rope access technicians for work at height
Access to difficult or restricted locations where traditional access methods are not feasible
Support for inspection, maintenance and minor repair works on structures and assets
Safe execution of works on bridges, embankments, retaining structures, cuttings and infrastructure assets
De vegetation & Vegetation Management
Clearance of vegetation from infrastructure corridors, including rail, highways and construction sites
Removal of trees, shrubs, invasive species and overgrowth
Maintenance of sightlines, access routes and safety critical areas
Vegetation management in environmentally sensitive or restricted locations
Specialist Access & Working at Height
Rope access for steep slopes, confined spaces and difficult terrain
Support works in live and operational environments with minimal disruption
Integration with other works such as inspections, surveys and maintenance
Environmental & Arboricultural Support
Compliance with environmental constraints and ecological requirements
Controlled removal and disposal of vegetation and arisings
Working in accordance with relevant environmental regulations and permits
Emergency & Reactive Services
Rapid response for emergency vegetation clearance (e.g. storm damage, fallen trees, access obstruction)
Urgent rope access interventions for safety or operational requirements
How to Apply:
Suppliers must express interest through CompeteFor to receive further tender information, including lot structure and next steps.