Depot Fire Break & Void Detection Surveys
TenderHighlights
- Tender deadline
- —
- Estimated value
- —
- Location
- UKH24
Details
- Published
- 26 Oct 2026
- Tender deadline
- —
- Value
- —
- Location
- UKH24
- Source
- Find a Tender
- Source notice ID
- 101045-2026
- OCID
- ocds-h6vhtk-079033
- CPV codes
- 45312100, 45343000, 45343100, 75251110
Description
It has been highlighted a number of non-compliances in connection with the fire break and void protection of the ceiling voids, Throughout Several of our depots.
The project will be to review the existing fire prevention measures currently in place within the ceiling voids noting any associated fire stopping, fire breaks or fire prevention currently in place. Culminating in producing a scope of works for fire protection of the roof void, including fire breaks, fire stopping to any existing walls and a full and considered review of the void protection in line with the current fire alarm system
For more information about this opportunity, please visit the eSourcing portal at:
https://gtr.delta-esourcing.com/tenders/UK-UK-London:-Fire-alarm-system-installation-work./55RTH245YJ
To respond to this opportunity, please click here:
https://gtr.delta-esourcing.com/respond/55RTH245YJ
Similar opportunities
- Pittville Recreation Centre Re-roofing works over the first-floor café areaTenderCheltenham Borough CouncilCloses 23 Nov 2026
- SuDS2601 - St Ives Crescent SuDSTenderNorth East Lincolnshire Borough CouncilCloses 3 Nov 2026
- DNWP0027- Lot 1B / WAGR B55 Demolition - Sellafield - A2R JVTenderAltrad AtkinsRealis Joint Venture (A2R JV)Closes 10 Nov 2026
- The Provision of OBSIDIAN SupportTenderMinistry of DefenceCloses 6 Jan 2027
- BCU-ITT-64411 - YGC Drop Down MortuaryTenderBetsi Cadwaladr University Health BoardCloses 25 Nov 2026
More from Thameslink Southern Great Northern Limited (TSGN)
View all- Depot Fire Break & Void Detection SurveysTerminationThameslink Southern Great Northern Limited (TSGN)—
- Graffiti Detection SystemTenderThameslink Southern Great Northern Limited (TSGN)—
- Supply of Paint and Consumables - Selhurst DepotTenderThameslink Southern Great Northern Limited (TSGN)Closes 23 Dec 2026
- GTR1106 - Supply of Paint and Consumables - Selhurst DepotTerminationThameslink Southern Great Northern Limited (TSGN)—
- Customer Contact CentreAwardThameslink Southern Great Northern Limited (TSGN)Awarded
Lots (3)
| Lot | Title | Value |
|---|---|---|
| 1 | Bedford, Peterborough , Letchworth , WelwynIt has been highlighted a number of non-compliances in connection with the fire break and void protection of the ceiling voids, Throughout Several of our depots. The project will be to review the existing fire prevention measures currently in place within the ceiling voids noting any associated fire stopping, fire breaks or fire prevention currently in place. Culminating in producing a scope of works for fire protection of the roof void, including fire breaks, fire stopping to any existing walls and a full and considered review of the void protection in line with the current fire alarm system This lot is for Depots in the Northern Geographical area of TSGNs estate | — |
| 2 | Selhurst, Battersea , Hornsey, Streatham Hill , CricklewoodIt has been highlighted a number of non-compliances in connection with the fire break and void protection of the ceiling voids, Throughout Several of our depots. The project will be to review the existing fire prevention measures currently in place within the ceiling voids noting any associated fire stopping, fire breaks or fire prevention currently in place. Culminating in producing a scope of works for fire protection of the roof void, including fire breaks, fire stopping to any existing walls and a full and considered review of the void protection in line with the current fire alarm system This lot is for Depots within the London Area | — |
| 3 | Brighton , Bognor Regis, Hove , Littlehampton HorshamIt has been highlighted a number of non-compliances in connection with the fire break and void protection of the ceiling voids, Throughout Several of our depots. The project will be to review the existing fire prevention measures currently in place within the ceiling voids noting any associated fire stopping, fire breaks or fire prevention currently in place. Culminating in producing a scope of works for fire protection of the roof void, including fire breaks, fire stopping to any existing walls and a full and considered review of the void protection in line with the current fire alarm system This lot is for Sussex are depots of the TSGN estate | — |