Manchester International Airport - Demolition Works
TenderHighlights
- Tender deadline
- 3 Sept 2026
- Estimated value
- £100,000
- Location
- North West
Details
- Published
- 27 Aug 2026
- Tender deadline
- 3 Sept 2026
- Value
- £100,000
- Location
- North West
- Source
- Contracts Finder
- Source notice ID
- fe55e276-5324-4eb6-b31f-f9922bb3d9d8-912256
- OCID
- ocds-b5fd17-bf10bb83-a20f-4c2d-82ee-a43249a961da
- CPV codes
- 45234116
Description
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.
The scope areas for this package are as follows:
-Installation, maintenance and removal of rail track protection.
-Structural enabling and demolition works to an existing bridge structure.
-Removal and disposal of road and pavement surfacing, kerbs, ducts and associated materials.
-Careful removal and storage of existing coping stones and pilaster caps for potential reuse.
-Demolition of existing parapets, pilasters, precast beams, cill beams and south abutment concrete.
-Demolition and disposal of bridge structural elements in accordance with project requirements.
-Working within a rail environment with compliance to all relevant safety and possession requirements."
Similar opportunities
- UOW1000 - Drainage ServicesTenderUniversity Of WorcesterCloses 24 Sept 2026
- T26-072ENV Replacement Boilerhouse Control Panel at Riversdale Leisure CentreTenderDerry City and Strabane District CouncilCloses 25 Sept 2026
- Display Case Lighting at The McManusTenderDundee City CouncilCloses 28 Sept 2026
- Full Turnkey Biomass Reinstatement – Strathearn Community Campus and Breadalbane Community CampusTenderPerth & Kinross CouncilCloses 28 Sept 2026
- Toilet Block Refurbishment at Santon DownhamTenderForestry CommissionCloses 25 Sept 2026
More from Kier Transportation - CP7 NWC
View all- Manchester International Airport - Permanent Way WorksTenderKier Transportation - CP7 NWCCloses 28 Aug 2026
- Manchester International Airport - Steel Parapet Bridge FasciaExpiredKier Transportation - CP7 NWCClosed 20 Jul 2026
- Manchester International Airport - Precast Concrete BeamsExpiredKier Transportation - CP7 NWCClosed 20 Jul 2026