Manchester International Airport Phase 2 - Overbridge Civils
TenderHighlights
- Tender deadline
- 30 Oct 2026
- Estimated value
- £1,000,000
- Location
- North West
Details
- Published
- 23 Oct 2026
- Tender deadline
- 30 Oct 2026
- Value
- £1,000,000
- Location
- North West
- Source
- Contracts Finder
- Source notice ID
- 95829fc3-7441-4732-aadd-5507054df0b7-919052
- OCID
- ocds-b5fd17-c521aea8-943c-4f70-9efa-654205db5376
- CPV codes
- 45233210
Description
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.
The works comprise the construction and completion of the bridge structure and associated highway infrastructure, including:
- Installation of client-supplied precast bridge components, including cills, beams and side walls, together with associated shear key reinforcement and grout connections.
- Modification of existing bridge cill.
- Supply and installation of bridge bearing plates, including associated screed works.
- Construction of pile caps/infill.
- Placement of in-situ concrete shear key infill.
- Construction of the reinforced concrete bridge deck slab.
- Construction of reinforced concrete parapet walls.
- Placement of in-situ concrete footpaths and fill areas.
- Construction of pilasters, including reinforced concrete and brickwork elements.
- Supply and installation of parapet and pilaster copings.
- Construction of associated fencing, signage and PCC retaining wall.
- Installation of associated ducting works.
- Completion of highway works excluding final road surfacing.
- Application of bridge waterproofing systems, installation of expansion joints, and completion of associated sealing and mastic works.
- Construction of associated drainage works.
Exclusions: Final road/footpath surfacing works are excluded from this scope.
Similar opportunities
- Pittville Recreation Centre Re-roofing works over the first-floor café areaTenderCheltenham Borough CouncilCloses 23 Nov 2026
- SuDS2601 - St Ives Crescent SuDSTenderNorth East Lincolnshire Borough CouncilCloses 3 Nov 2026
- DNWP0027- Lot 1B / WAGR B55 Demolition - Sellafield - A2R JVTenderAltrad AtkinsRealis Joint Venture (A2R JV)Closes 10 Nov 2026
- BCU-ITT-64411 - YGC Drop Down MortuaryTenderBetsi Cadwaladr University Health BoardCloses 25 Nov 2026
- DN Colleges Group - North Lindsey College - ITT for Global House Reclad and Refurbishment ProjectTenderDN Colleges GroupCloses 9 Nov 2026
More from Kier Transportation - CP7 NWC
View all- Manchester International Airport - Rail Footprint CivilsExpiredKier Transportation - CP7 NWCClosed 22 Oct 2026
- Manchester International Airport - Shotcrete worksExpiredKier Transportation - CP7 NWCClosed 16 Oct 2026
- Manchester International Airport - OLE Phase 3 WorksExpiredKier Transportation - CP7 NWCClosed 9 Oct 2026
- Manchester International Airport - Demolition WorksExpiredKier Transportation - CP7 NWCClosed 3 Sept 2026
- Manchester International Airport - Permanent Way WorksExpiredKier Transportation - CP7 NWCClosed 28 Aug 2026